Agrifer Berengariocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Appena fuori dal centro storico, accanto al parco Novi Sad, ed appena dietro la colonnina troviamo subito bar, pizzeria, forno ecc. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-agrifer-22-kw-modena-mo-via-jacopo-berengario-32-t38154.html
https://www.forumelettrico.it/forum/colonnina-agrifer-22-kw-modena-mo-via-jacopo-berengario-32-t38154.html Comment by ForumElettrico.it 07/08/2024 09:41:17
Other Charging Locations
There are 9 matching results
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Agrifer Palazzo dei Musei
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Modena Stadio | EnelX by Hera
4
11
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Agrifer Stadio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enermia Hotel Central Park
1
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Modena San Domenico | EnelX by Hera
4
10
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
FastWay
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
FastWay
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Emilia Ovest
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-07-08
Uploaded by ForumElettrico.it on 2024-07-08
Uploaded by ForumElettrico.it on 2024-07-08
Uploaded by ForumElettrico.it on 2024-07-08
Uploaded by ForumElettrico.it on 2024-07-08