To edit, add comments or upload photos: Sign In
El's Coffee Roasterycharging location
Nearest Address:
El's Coffee Roastery,
Jl Sukarno - Hatta
Bandar Lampung
Lampung
35122
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh
Operational Status:
Operational
Latitude:
-5.3938916918100945
Longitude:
105.28858582107125
OCM Ref: OCM-298863
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-547740
100 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-547741
25 kW
DC
Delta DC Wallbox
CHAdeMO
Operational
1 Present
OCM-CN-547742
25 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-547743
22 kW
AC (Three-Phase)
Delta AC Max
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rumah Kayu
0.5 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Transmart Bandar Lampung
0.88 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Holiday Inn Bukit Randu
2.11 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Mall Bumi Kedaton
2.2 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Chery Lampung
2.22 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Kampus IBI Darmajaya
2.89 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP UP3 Tanjung Karang
2.95 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BIPO BYD Lampung
2.98 Miles
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
RS Airan Raya
2.99 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In