Be Charge Cervarezzacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]In pochi minuti a piedi si può salire per trovare un comodo bar lungo la statale, oppure si può scendere per arrivare in centro città dove troviamo anche negozi e servizi di vario tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-ventasso-re-via-della-resistenza-103-cervarezza-t36627.html
https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-ventasso-re-via-della-resistenza-103-cervarezza-t36627.html Comment by ForumElettrico.it 03/23/2024 11:12:28
Other Charging Locations
There are 9 matching results
Be Charge Cervarezza
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Busana
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cinquecerri
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cerreto Laghi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Morsiano
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Ramiseto
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Emobitaly Croce Verde
3
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Piazza Unità
1
1
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Piazza Peretti Castelnovo ne’ Monti
1
1
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-03-23
Uploaded by ForumElettrico.it on 2024-03-23
Uploaded by ForumElettrico.it on 2024-03-23
Uploaded by ForumElettrico.it on 2024-03-23
Uploaded by ForumElettrico.it on 2024-03-23