Municipalité de Saint-Arsène - 63 rue de L'Églisecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Circuit Electrique http://www.lecircuitelectrique.com 1 855 999-8378
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
328704
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Cacouna
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cacouna
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Municipalité de Cacouna - 435 rue de l'Église
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Auberge de la Pointe
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Quality Inn
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BRCC - Rivière-du-Loup - Normandin
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
BRCC - Rivière-du-Loup - Normandin
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Berube Chevrolet Cadillac Buick GMC
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
80 Boulevard Cartier
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In