Powerstop Volvo Motorsclubcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Uscendo verso nord troviamo subito un comodo bar ristorante, situato accanto alla stazione di servizio. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-powerstop-high-power-volvo-motorsclub-modena-mo-via-giovanni-dalton-85-t30051.html
https://www.forumelettrico.it/forum/colonnina-powerstop-high-power-volvo-motorsclub-modena-mo-via-giovanni-dalton-85-t30051.html Comment by ForumElettrico.it 09/29/2023 14:48:23
Other Charging Locations
There are 9 matching results
Emobitaly CNA
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Opel Renostar
5
11
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commerciale I Portali | EnelX by Hera
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Questura
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Torrenova
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Piscine Pergolesi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MODENA Nonantolana | ENELX BY HERA
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Allego Nissan Pelloni Auto
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Colonnina 22kW AutoGem
1
4
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-09-29
Uploaded by ForumElettrico.it on 2023-09-29
Uploaded by ForumElettrico.it on 2023-09-29
Uploaded by ForumElettrico.it on 2023-09-29
Uploaded by ForumElettrico.it on 2023-09-29