To edit, add comments or upload photos: Sign In
Z Courtenay Streetcharging location
Nearest Address:
cnr Courtenay Street and Liardet Street
New Plymouth
Taranaki
4310
New Zealand
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
$0.88/kWh
Operational Status:
Operational
Latitude:
-39.05770415635781
Longitude:
174.07688570033747
OCM Ref: OCM-274884
Network/Operator
Z Energy https://www.z.co.nz/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
3 Present
OCM-CN-477171
200 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-477172
25 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
New Plymouth (New World)
1
0.03 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
New Plymouth Supercharger
0.56 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Belt Road Seaside Holiday Park
1.18 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
Z Whaiwhakaiho
1.84 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mitre 10 Mega New Plymouth
2.15 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Warehouse Bell Block
3.86 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pukeiti
1
11.17 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In