Be Charge charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Appena fuori dal centro storico e strategica per il Cinema Teatro Verdi Crevalcore e per la Casa della Salute delle Terre D’Acqua, situate li vicino andando verso sud. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-crevalcore-bo-viale-liberta-t32815.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-crevalcore-bo-viale-liberta-t32815.html Comment by ForumElettrico.it 08/01/2023 08:43:46
Other Charging Locations
There are 9 matching results
Be Charge Centro Civico
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Crocetta
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Matteo Poste | EnelX
3
10
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Nonantola Farmacia | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Cimitero
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Axpo Il Naviglio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Sabin
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-08-01
Uploaded by ForumElettrico.it on 2023-08-01
Uploaded by ForumElettrico.it on 2023-08-01
Uploaded by ForumElettrico.it on 2023-08-01
Uploaded by ForumElettrico.it on 2023-08-01