Yukon Government Legislaturecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
257043
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Jim Smith Building - South parking lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Tourism Business Centre
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Government of Yukon - Visitor Information Centre
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Government of Yukon
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
YK Hospital-1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
RGS EV FLo Station
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Whitehorse Motors Ford
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Whitehorse NorthLight Innovation
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Raven Inn and Suites
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In