To edit, add comments or upload photos: Sign In
Alameda 29 Junhocharging location
Nearest Address:
Alameda 29 Junho
Ribeira Grande
9600-587
Portugal
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Operational Status:
Not Operational
Latitude:
37.818137
Longitude:
-25.530737
OCM Ref: OCM-257354
Data Provider:
Mobie.pt http://www.mobie.pt
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Public Data redistributed by agreement
Providers Ref:
RGR-00007
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Status Unknown
1 Present
OCM-CN-429371
22 kW
AC (Three-Phase)
400 V
32 A
Type 2 (Tethered Connector)
Status Unknown
1 Present
OCM-CN-429372
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
RGR-00005
0.53 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
RGR-00006
0.65 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
RGR-00004
0.67 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
RGR-00001
1.29 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
RGR-00003
2.04 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LAG-00001
5.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pestana Bahia Praia
7.89 Miles
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Circular de Ponta Delgada – Laranjeiras
8.04 Miles
Operational
Level 3: High (Over 40kW)
CHAdeMO
Operational
Level 3: High (Over 40kW)
CHAdeMO
PDL-00008 - KFC
8.16 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by usuarioanonimo on 2023-11-27