To edit, add comments or upload photos: Sign In
Сочи Эсто-Садок +540 (NSP) 80кВтcharging location
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
17 р/кВт*ч
Operational Status:
Operational
Latitude:
43.682363
Longitude:
40.262725
OCM Ref: OCM-256654
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-427438
80 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-427439
50 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Казино Сочи
0.48 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Отель Грейс Империал
0.83 Miles
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Красная Поляна +960
1.02 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Green Drive Azimut Hotel
1
1.45 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Пятёрочка Красная Поляна
3.13 Miles
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
2304
3.79 Miles
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In