OUC HARMONY UNIT 01charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
172582
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Osceola Power Plant
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Harmony
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Starling Chevy St Cloud
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Kisselback Ford
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
St Cloud Senior Center
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
St Cloud City Hall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
St Cloud Lakefront Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
St. Cloud Hospital - Parking Lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Canoe Creek Service Plaza
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In