Skip to content
Charging location

Rocklin City Hall

OCM-224092 Operational Private - Restricted Access
To edit, add comments or upload photos Sign in

Nearest Address

3970 Rocklin Rd
Rocklin
CA
95677
United States

Summary

Number Of Stations/Bays
1
Usage
Private - Restricted Access
Operational Status
Operational
Latitude
38.7896318561129
Longitude
-121.234638451389
OCM Ref
OCM-224092

Access Information

8am-5pm daily

Network/Operator

(Unknown Operator)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 1 (J1772)

1 present
Operational
3.7 kW
230 V
16 A
AC (Single-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

4450 Rocklin Road, Rocklin, CA, 95677, United States
0.55 Miles Public Operational Level 3: High (Over 40kW) CHAdeMO
4747 Granite Dr, Rocklin, CA, 95677, United States
0.77 Miles Public - Pay At Location Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
4448 Granite Dr, Rocklin, CA, 95677, United States
1.03 Miles Public Temporarily Unavailable Level 2 : Medium (Over 2kW) Type 1 (J1772)
5100 Sierra College Blvd., Rocklin, CA, 95677, United States
1.03 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
4401 Granite Drive, Rocklin, CA, United States
1.27 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 1)
5100 Sierra College Blvd., Rocklin, CA, 95677, United States
1.34 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
4401 Granite Dr, Rocklin, CA, 95677, United States
1.35 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 1)
4401 Granite Dr, Rocklin, CA, 95677, United States
1.35 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 1)
Upload your own photos for this location Sign In