Sesquicentennial State Parkcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
9am-6pm F-T
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
166482
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Sesquicentennial State Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
9564 Two Notch Rd (US-32R-A6D-1)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Dick Smith Nissan
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Columbia Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Hilton Garden Inn Columbia Northeast - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
R2I2 & RCPL
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
R2I2 & RCPL R212 EV2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
R2I2 & RCPL R2I2 EV3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Columbia, SC - Town Center Place Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Upload your own photos for this location: Sign In