Brownsville Commons Powder Springs GAcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm
Shell Recharge Solutions (US) https://shellrecharge.com/en-us/solutions
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
221113
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
(400) BUILDING BUILDING 4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
GreyStone Power Corp
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Stay-N-Charge EV Charging Station - Holiday Inn Express & Suites Atlanta NW - Powder Springs
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Greystone P
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cobb County Government
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
COBB COUNTY
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Swirl Films Studios - Tesla Destination
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Ionna Rechargery Relay - Austell, GA
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
MB - Austell, GA
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In