Be Charge San Prosperocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto abbiamo un centro commerciale con qualche negozio ed un paio di bar. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-parma-pr-via-francesca-pennisi-5-a-san-prospero-t27445.html
https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-parma-pr-via-francesca-pennisi-5-a-san-prospero-t27445.html Comment by ForumElettrico.it 09/22/2022 09:35:47
Other Charging Locations
There are 9 matching results
EnerMia McDonald's
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X McDonald's
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Agenzia delle Entrate
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Mercedes-Benz Autotorino San Lazzaro
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
IPlanet IP
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sant'Ilario Gramsci | Enelx
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eurosia
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sant'Ilario Podgora | EnelX
2
7
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-09-22
Uploaded by ForumElettrico.it on 2022-09-22
Uploaded by ForumElettrico.it on 2022-09-22
Uploaded by ForumElettrico.it on 2022-09-22
Uploaded by ForumElettrico.it on 2022-09-22