Villaggio Verde Cupracharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata in un villaggio dotato di tutti i servizi, con il mare e il borgo di Marano (Cupra Alta) a pochi minuti a piedi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-22-kw-villaggio-verde-cupra-cupra-marittima-ap-via-emilia-t25847.html
https://www.forumelettrico.it/forum/colonnina-22-kw-villaggio-verde-cupra-cupra-marittima-ap-via-emilia-t25847.html Comment by ForumElettrico.it 06/25/2022 15:12:08
Other Charging Locations
There are 9 matching results
Enel X Way Grottammare Alta
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Piscina Comunale
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Piceno Ovest
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Piceno Ovest
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via Calatafimi
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio Museo del Mare
1
(Unknown)
Temporarily Unavailable
Contea Dei Ciliegi
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Viale Pasqualini
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pedaso Valdaso | ENELX FAST
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-25
Uploaded by ForumElettrico.it on 2022-06-25
Uploaded by ForumElettrico.it on 2022-06-25
Uploaded by ForumElettrico.it on 2022-06-25
Uploaded by ForumElettrico.it on 2022-06-25
Uploaded by ForumElettrico.it on 2022-06-25