Be Charge Municipiocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dietro il teatro abbiamo un supermercato ed in pochi minuti a piedi troviamo bar, ristoranti ed esercizi commerciali di ogni tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-municipio-di-savignano-sul-panaro-mo-piazza-paolo-borsellino-10-t25585.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-municipio-di-savignano-sul-panaro-mo-piazza-paolo-borsellino-10-t25585.html Comment by ForumElettrico.it 06/09/2022 14:09:13
Other Charging Locations
There are 9 matching results
Ressolar Cimitero monumentale di Savignano Alto
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Centro Polivalente Savignanese
4
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Municipio
2
6
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Savignano sul Panaro Claudia | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vignola Trento e Trieste | ENELX BY HERA
1
5
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Formica
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale di Vignola
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Stazione di Savignano Mulino
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Mulino
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-09
Uploaded by ForumElettrico.it on 2022-06-09
Uploaded by ForumElettrico.it on 2022-06-09
Uploaded by ForumElettrico.it on 2022-06-09
Uploaded by ForumElettrico.it on 2022-06-09