Enel X Enicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dall'altra parte della strada troviamo un supermercato, ed a 5 minuti a piedi verso est abbiamo un paio di bar. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-fast-eni-firenze-fi-via-sestese-101-t25494.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-eni-firenze-fi-via-sestese-101-t25494.html Comment by ForumElettrico.it 06/05/2022 14:19:58
Other Charging Locations
There are 9 matching results
Enel X Way Centro Sesto
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Morandi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Eneldrive (ex SILFI) Stazione Firenze Rifredi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Eneldrive (ex SILFI) Lippi e Macia
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
EVAD Palazzo di Giustizia di Novoli
3
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Stazione Telecom
(Unknown)
Unknown
Comune Coop Novoli
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Coop Novoli | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Estra Piazza del Mercato Sesto Fiorentino
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05