Enel X charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dall'altro lato del parcheggio c'è un bar, ma siamo a pochi minuti a piedi dal centro storico dove si trova di tutto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-15-kw-calderara-di-reno-bo-via-giacomo-matteotti-2-t24844.html
https://www.forumelettrico.it/forum/colonnina-enel-x-15-kw-calderara-di-reno-bo-via-giacomo-matteotti-2-t24844.html Comment by ForumElettrico.it 04/30/2022 13:15:03
Other Charging Locations
There are 9 matching results
Enel X Dico San Vitale Grande
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eldorado - ALD Premium Point | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Calderara di Reno Bazzane | EnelX by Hera
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Stazione di Calderara-Bargellino
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
UnGiro Bargellino
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Bargellino
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ParkinGO BOLOGNA
1
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Osteria Nuova
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Lippo
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-04-30
Uploaded by ForumElettrico.it on 2022-04-30
Uploaded by ForumElettrico.it on 2022-04-30
Uploaded by ForumElettrico.it on 2022-04-30
Uploaded by ForumElettrico.it on 2022-04-30