Hera Parco Enzo Ferraricharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con Shell Recharge sulla presa di sinistra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post364381.html#p364381
https://www.forumelettrico.it/forum/post364381.html#p364381 Comment by ForumElettrico.it 02/11/2023 16:04:48
[ General Comment , Charged Successfully ]Accanto a un grande parco con all'interno un laghetto, un paio di parchi giochi per bambini e di bar. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hera-12-kw-parco-enzo-ferrari-modena-mo-strada-san-faustino-161-t21665.html
https://www.forumelettrico.it/forum/colonnina-hera-12-kw-parco-enzo-ferrari-modena-mo-strada-san-faustino-161-t21665.html Comment by ForumElettrico.it 11/20/2021 11:05:12
Other Charging Locations
There are 9 matching results
Hera Rainusso
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Centro Polivalente Corassori
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way McDonald's
1
5
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Modena Emilia Ovest | EnelX by Hera
2
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Supermercato Lidl
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge IP
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Emilia Ovest
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
FastWay
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
FastWay
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-02-11
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28
Uploaded by ForumElettrico.it on 2021-11-28