Felix Margoz con Pedro Aguirre Cerda - Cerrilloscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Copec Voltex https://ww2.copec.cl/voltex
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Temuco
Private - Restricted Access
Operational
Express de Líder Maipú (Isabel Riquelme)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Fuente de Agua Parque Pajaritos
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Av. Los Pajaritos
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Integramédica Estación central
Public - Membership Required
Operational
Nataniel Cox
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Educacional Matías Cousiño
Public - Membership Required
Operational
Enel X - ANGLO - ENEA - 75-150kW - Cable GB/T
Public - Membership Required
Operational
Avenida Américo Vespucio
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In