Pošta Slovenijecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Gratuita e situata nella prima cittadina slovena dopo aver passato il confine. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-22-kw-posta-slovenije-se-ana-kp-partizanska-cesta-41-t17475.html
https://www.forumelettrico.it/forum/colonnina-22-kw-posta-slovenije-se-ana-kp-partizanska-cesta-41-t17475.html Comment by ForumElettrico.it 05/01/2021 05:38:17
Other Charging Locations
There are 9 matching results
Involta Sežana DC
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BS MOL
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVAD Area Science Park
1
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Area Science Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive verso Opicina
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AREA SCIENCE PARK
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Basovizza
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Comune Di Trieste - Consigli Circoscrizionali
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
TRG 15. Aprila (pri Občini)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-05-01
Uploaded by ForumElettrico.it on 2021-05-01
Uploaded by ForumElettrico.it on 2021-05-01