Be Charge Porretta Termecharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 1
Usage: Public
Usage Cost: 0.45
Operational Status: Operational
Latitude: 44.17920253618445
Longitude: 10.978103667721598
OCM Ref: OCM-174859
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Operational
OCM-CN-270958
22 kW

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

In pochi minuti a piedi arriviamo a Silla, frazione del comune di Gaggio Montano, dove troviamo diversi bar ed esercizi commerciali. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-alto-reno-terme-bo-via-john-fitzgerald-kennedy-173-t25500.html

https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-alto-reno-terme-bo-via-john-fitzgerald-kennedy-173-t25500.html Comment by ForumElettrico.it 06/05/2022 17:06:09

Other Charging Locations

There are 9 matching results

Plenitude Berzantina
1   5

Via Berzantina 9
Castel di Casio
BO
Italy
View
1.43 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Ewiva Porretta Terme
1   5

Via Renato Managlia 9
Alto Reno Terme
BO
Italy
View
1.94 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Be Charge
1   6

Via Renato Managlia 4
Alto Reno Terme
Emilia-Romagna
40046
Italy
View
1.96 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Be Charge
1   5

Via Tre Novembre 107
Lizzano In Belvedere
BO
Italy
View
4.39 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Way Stazione di Riola
1   5

Via Nazionale 119
Vergato
BO
Italy
View
5.21 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Be Charge La Cà
1   5

Via Madonna dell'Acero 64
Lizzano In Belvedere
BO
Italy
View
6.25 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Plenitude Castel D'aiano
1   5

Via Val D'Aneva 1
Castel D'aiano
BO
Italy
View
7.09 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Plenitude Villa d'Aiano
1   5

Via Villa 45
Castel d'Aiano
BO
Italy
View
8.02 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Way
1   5

Via Corno alle Scale
Lizzano in Belvedere
BO
Italy
View
8.87 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2022-06-05

Uploaded by ForumElettrico.it on 2022-06-05

Uploaded by ForumElettrico.it on 2022-06-05

Uploaded by ForumElettrico.it on 2022-06-05

Uploaded by ForumElettrico.it on 2022-06-05

Uploaded by ForumElettrico.it on 2022-06-05