AdS BCcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]All'interno del benzinaio BC Energia presente sulla SP235 direzione Lodi. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-7kw-lodi-stazione-bc-energia-t10678.html
https://www.forumelettrico.it/forum/colonnina-7kw-lodi-stazione-bc-energia-t10678.html Comment by ForumElettrico.it 04/01/2021 09:48:15
Other Charging Locations
There are 9 matching results
COOP Lodi
3
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX EVA+ ADS IP Cornegliano Laudense
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Negozio Enel di LODI | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Decathlon Pieve Fissiraga
2
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Crema Diesel S.p.A | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Supercharger Lodi
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ekomobil - 22 Kw
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ekomobil - 22kW
1
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Massalengo Amendola | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-01
Uploaded by ForumElettrico.it on 2021-04-01
Uploaded by ForumElettrico.it on 2021-04-01