Università degli Studi di Parmacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Equipment Not Operational) ]Cinque colonnine per un totale di 10 prese tipo 2, ma non si riescono ad usare. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-3-7-kw-universita-di-parma-pr-parco-area-delle-scienze-t13655.html
https://www.forumelettrico.it/forum/colonnine-3-7-kw-universita-di-parma-pr-parco-area-delle-scienze-t13655.html Comment by ForumElettrico.it 10/29/2020 17:13:34
Other Charging Locations
There are 9 matching results
Campus Parma | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge The Space Cinema
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerMia The Space Cinema
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parma Rotta
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Montanara
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eurosia
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Parco Cavagnari
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Emobitaly Crédit Agricole Green Life
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-10-29
Uploaded by ForumElettrico.it on 2020-10-29