BeCharge Alba Fucenscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ General Comment , Charged Successfully ]Caricato perfettamente a circa 20kw (credo, ho una zoe non posso verificare). L'unico problema del posto è che è un paesino sperduto e la connessione dati va un po' male. Molto vicino all'autostrada di Magliano ed Avezzano
Comment by ValerioBob 10/20/2020 12:39:05
Other Charging Locations
There are 9 matching results
Monte Magnola Impianti s.r.l | BeCharge
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palazzetto dello sport di Celano
3
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Celano Parcheggio Piazza Aia | EnelX
2
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ovindoli Campi Sportivi | Becharge
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Campo Felice
2
1
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ADS Iani Petroli San Benedetto dei Marsi
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Rocca di Cambio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Matteotti 18
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
HOTEL SAN BERARDO Pescina
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In