CONCESSIONARIO NISSAN Ren-auto PIRACCINIcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
PlugSurfing https://www.plugsurfing.com/ +49 30 9599814 10
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]La porzione di cancello scorrevole è ancora chiusa quindi risulta difficile l'uso dall'esterno. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-fast-nissan-ren-auto-rimini-rn-via-italia-24-t15889.html
https://www.forumelettrico.it/forum/colonnina-fast-nissan-ren-auto-rimini-rn-via-italia-24-t15889.html Comment by ForumElettrico.it 04/07/2021 06:06:43
Other Charging Locations
There are 9 matching results
BeCharge Rimini Edera
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BeCharge Rimini Malatesta
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Fiera di Rimini - Parcheggio Est
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiera di Rimini - Parcheggio Sud
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Caduti di Cefalonia
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiera di Rimini - Parcheggio Ovest
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Rimini Rivabella
1
3
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Toscanelli Altamarea
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07