Ontario Charging Network LP Canadian Tirecharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
157848
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Badlands Golf Company - EV Parking Spaces. 41 Ira
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Recipe Unlimited Corp
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WATERLOO REGION PSHQ STAFF 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
11
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WRDSB VISTA HILLS
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Boardwalk
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
The Boardwalk - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Scotiabank Waterloo
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Swtch Energy
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In