Ventura Investment Medical Building - Mobilecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
151942
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Camarillo Corp Yard 1-20
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Camarillo Metrolink Station
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CAMARILLO CITY HALL 11&12
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CAMARILLO CITY HALL 22
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CAMARILLO CITY HALL 1&2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CAMARILLO CITY HALL 17&18
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CT4000
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CPF25 SPACE 1 & 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CPF25 STATION 6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In