Vergato Pertini | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Ho ricaricato con NFC ed interrotto avvicinandomi all'auto, estraendo il cavo prima lato auto. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post209990.html#p209990
https://www.forumelettrico.it/forum/post209990.html#p209990 Comment by ForumElettrico.it 06/02/2021 15:30:57
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-vergato-bo-via-sandro-pertini-141-t9021.html Comment by ForumElettrico.it 02/02/2020 19:15:22
Other Charging Locations
There are 9 matching results
Plenitude Tolè
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Enel X Way Stazione di Riola
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Castel D'aiano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Pian di Vénola
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge CRAI Lagaro
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Stazione
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Villa d'Aiano
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Palazzetto dello Sport
2
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-06-02
Uploaded by ForumElettrico.it on 2020-02-02
Uploaded by ForumElettrico.it on 2020-02-02
Uploaded by ForumElettrico.it on 2020-02-02
Uploaded by ForumElettrico.it on 2020-02-02