Desjardins - La Mataniecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
Circuit Electrique http://www.lecircuitelectrique.com 1 855 999-8378
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
146567
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
CAISSE MATANIE CAISSE MATANIE2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Édifice de La Matanie
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
382 avenu St-Jérôme
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Colisée Béton-Provincial
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Colisée Béton-Provincial
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BRCC-CDSMML-Matane
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Stade Fournier
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Stade Fournier
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hôtel et Centre de Congrès Riotel Matane
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In