New Brunswick Community College - Miramichi Campuscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
83579
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
NBCC - Miramichi Site
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Rodd Miramichi River Hotel
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NB Power
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Canadian Tire - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
MIRAMICHI HONDA STATION 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MIRAMICHI HONDA STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NBP - Northumberland Square Mall
Public
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 1)
NBP - Northumberland Square Mall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
TOWNE FORD TOWNE MAZDA FRT
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In