BECHARGE SPILAMBERTO Tintoricharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema infilando prima il cavo nella presa di sinistra e poi passando card Be Charge. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post342367.html#p342367
https://www.forumelettrico.it/forum/post342367.html#p342367 Comment by ForumElettrico.it 10/25/2022 10:43:20
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-spilamberto-mo-piazza-dei-tintori-14-t8408.html Comment by ForumElettrico.it 12/22/2019 17:27:10
Other Charging Locations
There are 9 matching results
BeCharge Spilamberto Campi Sportivi
3
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Spilamberto Ghiarole
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Spilamberto Tacchini BeCharge
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Spilamberto Rimembranze
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Coop Spilamberto
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Parco del Guerro San Vito
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge San Vito
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mennekes Enercoop
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Modena Supercharger
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-10-25
Uploaded by ForumElettrico.it on 2022-10-25
Uploaded by ForumElettrico.it on 2019-12-22
Uploaded by ForumElettrico.it on 2019-12-22
Uploaded by ForumElettrico.it on 2019-12-22
Uploaded by ForumElettrico.it on 2019-12-22