LIDL Pescaracharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Lidl https://info.lidl/en
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Classica Swarco plug and charge da 22 kW nel parcheggio del Lidl, di fronte a Naturasì. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-lidl-swarco-via-tiburtina-valeria-76-78-pescara-t9755.html
https://www.forumelettrico.it/forum/colonnina-lidl-swarco-via-tiburtina-valeria-76-78-pescara-t9755.html Comment by ForumElettrico.it 03/16/2021 15:14:16
Other Charging Locations
There are 9 matching results
Pescara Ciglia | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pescara Porta Nuova | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX Parcheggio Aterno-Manthonè
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Conad del Circuito
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Best Western Hotel Plaza
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Be Charge Eni
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Tigre
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Umberto I Sud-Ovest
1
2
Public
Operational
Enel X Umberto I Nord-Est
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by ForumElettrico.it on 2021-03-16