Officina F.lli Varani | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema sulla tipo 2 di sinistra con card Hera (anche se lo sportello permane rotto, ma non da problemi). Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post167148.html#p167148
https://www.forumelettrico.it/forum/post167148.html#p167148 Comment by ForumElettrico.it 01/09/2021 16:04:25
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-f-lli-varani-piacenza-pc-via-bertolini-3-t7710.html Comment by ForumElettrico.it 11/02/2019 09:08:28
Other Charging Locations
There are 9 matching results
C.B.A. Energia Fametec
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cimitero
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Decathlon
1
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl
1
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Punto Enel
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conciliazione
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aldi Piacenza
2
6
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge McDonald’s
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge iN's Mercato
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-01-09
Uploaded by ForumElettrico.it on 2019-11-02
Uploaded by ForumElettrico.it on 2019-11-02
Uploaded by ForumElettrico.it on 2019-11-02
Uploaded by ForumElettrico.it on 2019-11-02
Uploaded by ForumElettrico.it on 2019-11-02