Stazione di Carpi | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok su presa di destra con card Hera. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post166702.html#p166702
https://www.forumelettrico.it/forum/post166702.html#p166702 Comment by ForumElettrico.it 01/08/2021 10:09:38
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-carpi-mo-piazzale-della-stazione-3-t5860.html Comment by ForumElettrico.it 06/08/2019 13:06:52
Other Charging Locations
There are 9 matching results
Carpi Carducci | EnelX
3
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carpi Cantina della Pioppa | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carpi Morgagni | EnelX
3
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Credem
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carpi Giulio Cesare | Enel X
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carpi Baracchi | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Ospedale
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Carpi Benassi | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carpi Meloni Di Quartirolo | EnelX
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-01-08
Uploaded by ForumElettrico.it on 2019-06-08
Uploaded by ForumElettrico.it on 2019-06-08
Uploaded by ForumElettrico.it on 2019-06-08
Uploaded by ForumElettrico.it on 2019-06-08