To edit, add comments or upload photos: Sign In
Eko sklad TICcharging location
Nearest Address:
Tržaška cesta 60b
Postojna
6230
Slovenia
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
45.772279
Longitude:
14.200286
OCM Ref: OCM-109471
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-154656
22 kW
AC (Three-Phase)
400 V
32 A
CEE 7/4 - Schuko - Type F
Operational
1 Present
OCM-CN-154657
3.6 kW
AC (Single-Phase)
230 V
16 A
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-eko-sklad-22-kw-postumia-po-tr-aska-cesta-60b-t3837.html Comment by ForumElettrico.it 10/15/2018 16:42:43
Other Charging Locations
There are 9 matching results
Amzs D.d., Pe Postojna
1
0.4 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hotel Kras**** (System www.enercharge.at)
0.62 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
OMV A1/e61/e70 Ravbarkomanda Vzhod
1
4
1.36 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
OMV A1/e61/e70 Ravbarkomanda Zahod
1
4
1.41 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
BS MOL
3.12 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Kolodvorska 51 (park Vojaške Zgodovine Pivka)
7.21 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Elektro Ljubljana Municipio
1
4
7.9 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PETROL A1/E61 Lom Zahod (Logatec)
1
4
9.1 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
PETROL A1/E61 Lom Vzhod (Logatec)
1
4
9.15 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2018-10-15
Uploaded by ForumElettrico.it on 2018-10-15
Uploaded by ForumElettrico.it on 2018-10-15
Uploaded by ForumElettrico.it on 2018-10-15