EnelX Boni e Gavazzicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con NFC Enel X sulla presa tipo 2 ed ho interrotto avvicinandomi all'auto ed estraendo il cavo prima lato auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post285775.html#p285775
https://www.forumelettrico.it/forum/post285775.html#p285775 Comment by ForumElettrico.it 03/05/2022 17:26:24
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-teatro-moruzzi-noceto-pr-via-boni-e-gavazzi-26-t3625.html Comment by ForumElettrico.it 09/16/2018 15:23:01
Other Charging Locations
There are 9 matching results
EnelX Piazzale dello Sport
3
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX Alberto Sordi
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conad Noceto
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Ponte Taro
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel San Marco & Formula Club
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Powy Parma Ovest Ponte Taro
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E.ON Albergo Trattoria Emiliana Ponte Taro
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ponte Taro Madre Teresa di Calcutta | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Decathlon
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-03-05
Uploaded by ForumElettrico.it on 2018-09-16
Uploaded by ForumElettrico.it on 2018-09-16
Uploaded by ForumElettrico.it on 2018-09-16
Uploaded by ForumElettrico.it on 2018-09-16