Autostrada del Brennero - Plessi Museumcharging location

Nearest Address:
Autostrada del Brennero
Brennero
BZ
39041
Italy

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 4
Usage: Public
Operational Status: Operational
Latitude: 46.995046563702914
Longitude: 11.502160056598086
OCM Ref: OCM-106958
Network/Operator

(Business Owner at Location)

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Operational
1 Present
OCM-CN-150784
50 kW DC
400 V

Type 2 (Tethered Connector)

Operational
1 Present
OCM-CN-150785
43 kW AC (Three-Phase)
400 V
64 A

CHAdeMO

Operational
1 Present
OCM-CN-150786
50 kW DC

Type 2 (Socket Only)

Operational
2 Present
OCM-CN-150787
22 kW AC (Three-Phase)
400 V
32 A

Add your own comment/check-in for this location:

Sign In
Rating: 4 out of 5 [ Important Notice (For Other Users) , Charged Successfully ]

now its not any more for free!

Comment by Toni 05/11/2023 10:35:51
Rating: 5 out of 5 [ General Comment , Charged Successfully ]

Free 50 kW charging!

Comment by interssl.com 08/04/2020 11:46:15
[ General Comment , Charged Successfully ]

Great free 50 kW CCS charger!

Comment by interssl.com 08/02/2020 03:10:14
Rating: 5 out of 5 [ General Comment , Charged Successfully ]

Sempre plug&charge e in corso di ampliamento https://www.forumelettrico.it/forum/brennero-fast-chademo-combo-ac-t406.html

https://www.forumelettrico.it/forum/brennero-fast-chademo-combo-ac-t406.html Comment by polianto 08/20/2018 19:17:56

Other Charging Locations

There are 9 matching results

Tesla Supercharger Brennero
1  

Plessi museum at the Brenner pass
Brennero
BZ
39041
Italy
View
0.03 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger

Ionity Brenner
1   9

Via San Valentino
Brennero
BZ
39041
Italy
View
0.8 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

SHELL FAST BRENNERSTRASSE 245
 

BRENNERSTRASSE 245
Gries
6156
Austria
View
0.93 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Wolfenhof
  2

Mühlgasse 11
Gossensass
Bozen
39041
Italy
View
4.99 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Raiffeisen Kundenparkplatz
1  

Brennerstraße
Salfaun
Marktgemeinde Steinach am Brenner
Bezirk Innsbruck-Land
6150
Austria
View
6.84 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Parcheggio funivia Monte Cavallo
 

Via Brennero, 41
Vipiteno
BZ
Italy
View
7.12 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Vipiteno Parkplatz Nord | Neogy
2   3

Parcheggio Nord - Parkplatz Nord, SS12
Vipiteno
BZ
39049
Italy
View
7.24 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

MPREIS (Smatrics)
  2

Erlach
Salfaun
Marktgemeinde Steinach am Brenner
Bezirk Innsbruck-Land
6150
Austria
View
7.44 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Comune di Vipiteno - Gemeinde Sterzing | Neogy
 

Via Raiser, 3
Vipiteno
BZ
39049
Italy
View
7.46 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by polianto on 2018-08-20

Uploaded by polianto on 2018-08-20

Uploaded by polianto on 2018-08-20