Colonnina Enermia 22kW charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok con card, ma su app non appare perché è gelocalizzata male, a km di distanza. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post175191.html#p175191
https://www.forumelettrico.it/forum/post175191.html#p175191 Comment by ForumElettrico.it 02/05/2021 18:14:25
[ General Comment , Equipment & Location Confirmed Correct ] https://www.forumelettrico.it/forum/colonnina-enermia-22kw-bologna-bo-via-scandellara-80-t3131.html Comment by ForumElettrico.it 07/06/2018 16:52:14
Other Charging Locations
There are 9 matching results
Eneldrive Fast EVA+ Nordiconad Vialarga
3
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BECHARGE Bologna Larga
4
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Best Western Plus Tower
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Bologna Via Larga | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Barelli
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Volkswagen Soverini
1
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Aspiag Interspar Bologna
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Colonnina e-Distribuzione 3,7kW Trony
1
2
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Bologna Fonditore Taxi | EnelX
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-02-05
Uploaded by ForumElettrico.it on 2021-02-05
Uploaded by ForumElettrico.it on 2018-07-06
Uploaded by ForumElettrico.it on 2018-07-06
Uploaded by ForumElettrico.it on 2018-07-06
Uploaded by ForumElettrico.it on 2018-07-06