Skip to content
Charging location

Velence, Velence Korzó

OCM-106364 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Széchenyi út
Velence
Fejér megye
2481
Hungary

Summary

Number Of Stations/Bays
2
Usage
Public
Usage Cost
bruttó 80 Ft/kWh
Operational Status
Operational
Latitude
47.228882996711
Longitude
18.6633238842225
OCM Ref
OCM-106364

Network/Operator

E-Mobi

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
80 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

2 present
Operational
22 kW
400 V
32 A
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Vörösmarty u. 2., Kápolnásnyék, Fejér megye, 2475, Hungary
0.84 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Velencei pihenőhely, M7 észak, Velence, Fejér megye, 2481, Hungary
1.61 Miles Public - Pay At Location Operational Level 3: High (Over 40kW) CCS (Type 2)
Velencei pihenőhely, M7 dél, Velence, Fejér megye, 2481, Hungary
1.67 Miles Public - Pay At Location Operational Level 3: High (Over 40kW) CCS (Type 2)
AVIA Benzinkút Kápolnásnyék , Jókai Mór utca , Kápolnásnyék , Magyarország, 2475, Hungary
1.91 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
M7 Váli Völgyi Pihenő, OMV kút mögött, az M7 Balaton felé vezető oldalán, Kajászó, 2472, Hungary
6.63 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In
Uploaded by molnartiby on 2018-07-02
Uploaded by molnartiby on 2018-06-21